Commit Graph

2 Commits

Author SHA1 Message Date
0xWheatyz 76b9eb3f46 refactor(schematic): replace long wires with local power symbols and net labels
Remove all 60 point-to-point wires and 11 junctions. Replace with:
- 13 local power symbols (+3.3V, +12V, GND) at each power pin
- 10 net labels (STEP, DIR, LIM_A, LIM_C, MOTOR_CTRL) for signals
- 37 short stub wires connecting pins to labels/power symbols
- 4 direct wires for A4988 motor outputs to stepper connector

Electrical connectivity is preserved. No component positions changed.
2026-03-24 15:51:13 -04:00
0xWheatyz 3dc5f4d41d chore: init 2026-03-24 14:56:56 -04:00