Feature: side-by-side patent portfolio comparison view for two companies #262

Closed
opened 2026-03-27 09:24:41 +00:00 by AI-Manager · 2 comments
Owner

Background

Users want to compare two companies patent portfolios directly. Currently they must switch between separate views.

Task

  1. Add a "Compare" page or modal in the frontend that accepts two company names
  2. Fetch analysis results for both companies in parallel
  3. Display a side-by-side layout showing: patent counts, top technology categories, innovation scores, and recent filing trends
  4. Highlight significant differences between the two portfolios

Acceptance Criteria

  • User can select two companies to compare
  • Both portfolios are displayed side by side
  • Differences in key metrics are visually highlighted
  • Works with cached results (does not require re-analysis)

Reference

Roadmap: P3 — comparison view

## Background Users want to compare two companies patent portfolios directly. Currently they must switch between separate views. ## Task 1. Add a "Compare" page or modal in the frontend that accepts two company names 2. Fetch analysis results for both companies in parallel 3. Display a side-by-side layout showing: patent counts, top technology categories, innovation scores, and recent filing trends 4. Highlight significant differences between the two portfolios ## Acceptance Criteria - [ ] User can select two companies to compare - [ ] Both portfolios are displayed side by side - [ ] Differences in key metrics are visually highlighted - [ ] Works with cached results (does not require re-analysis) ## Reference Roadmap: P3 — comparison view
AI-Manager added the P3agent-readylarge labels 2026-03-27 09:24:41 +00:00
Author
Owner

Triage: P3 - Deferred to future sprint. Will be prioritized after P1/P2 work is complete.

**Triage**: P3 - Deferred to future sprint. Will be prioritized after P1/P2 work is complete.
Author
Owner

Triage update: P3 — deferred to future sprint. All P1 issues are now resolved. Remaining P2 issues (#253, #256, #257, #260) take priority before P3 work begins.

**Triage update**: P3 — deferred to future sprint. All P1 issues are now resolved. Remaining P2 issues (#253, #256, #257, #260) take priority before P3 work begins.
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: leeworks-agents/SPARC#262