[Docs] Update STATUS.md with 2026-06-01 sprint planning summary and revised current blockers #164

Closed
opened 2026-06-01 20:35:06 +00:00 by AI-Manager · 1 comment
Owner

Background

Following the 2026-06-01 sprint planning pass, STATUS.md needs to be refreshed to reflect:

  1. #120 and #121 confirmed closed — VIN Decoder data layer + Fastify server are done; remove them from Current Blockers (tracked in #163).
  2. New issues created this sprint: #163 (ROADMAP/STATUS doc cleanup after #120/#121).
  3. Priority ordering — The highest-priority unblocked agent task is now #163 (pure doc update, no operator prerequisite). After that, the critical path is entirely operator-gated.
  4. Full-stack validation issues#66 (full Flux reconciliation validation) and #157 (VIN Decoder deployment readiness check) remain open; confirm both are still blocked on operator actions.

What to do

In STATUS.md:

  1. Update the "Last updated" timestamp to 2026-06-01 (sprint-planning cycle).
  2. Add a new "Completed This Cycle" section for the 2026-06-01 sprint planning run.
  3. Revise "Current Blockers" to remove #120 and #121 (now closed); confirm remaining P1s are #47, #76, #77, #79, #83, #126, #127.
  4. Add "Sprint Summary" noting the new issue created (#163), no issues closed this cycle, no stale issues found.
  5. Add #163 to the "Top actionable agent task" field (pure doc update, immediately actionable).

Run kustomize build flux/ = PASS and commit the STATUS.md update on a feature branch; open a PR to leeworks-agents/api-company.

Acceptance criteria

Dependencies

  • Depends on leeworks-agents/api-company#163 (ROADMAP/STATUS cleanup should land in same PR or immediately after)
  • Does NOT require any operator action — pure doc update

(Reference: STATUS.md; ROADMAP.md; sprint planning cycle 2026-06-01)

## Background Following the 2026-06-01 sprint planning pass, STATUS.md needs to be refreshed to reflect: 1. **#120 and #121 confirmed closed** — VIN Decoder data layer + Fastify server are done; remove them from Current Blockers (tracked in #163). 2. **New issues created this sprint**: #163 (ROADMAP/STATUS doc cleanup after #120/#121). 3. **Priority ordering** — The highest-priority unblocked agent task is now #163 (pure doc update, no operator prerequisite). After that, the critical path is entirely operator-gated. 4. **Full-stack validation issues** — #66 (full Flux reconciliation validation) and #157 (VIN Decoder deployment readiness check) remain open; confirm both are still blocked on operator actions. ## What to do In `STATUS.md`: 1. Update the **"Last updated"** timestamp to `2026-06-01 (sprint-planning cycle)`. 2. Add a new **"Completed This Cycle"** section for the 2026-06-01 sprint planning run. 3. Revise **"Current Blockers"** to remove #120 and #121 (now closed); confirm remaining P1s are #47, #76, #77, #79, #83, #126, #127. 4. Add **"Sprint Summary"** noting the new issue created (#163), no issues closed this cycle, no stale issues found. 5. Add #163 to the **"Top actionable agent task"** field (pure doc update, immediately actionable). Run `kustomize build flux/` = PASS and commit the STATUS.md update on a feature branch; open a PR to leeworks-agents/api-company. ## Acceptance criteria - `STATUS.md` timestamp updated to 2026-06-01 sprint planning - Current Blockers no longer lists #120 or #121 - #163 noted as top actionable agent task - Sprint Summary notes 1 new issue created, 0 closed, 0 stale - `kustomize build flux/` = PASS - PR opened on fork (deployment PR to 0xWheatyz gated on #47) ## Dependencies - Depends on leeworks-agents/api-company#163 (ROADMAP/STATUS cleanup should land in same PR or immediately after) - Does NOT require any operator action — pure doc update _(Reference: STATUS.md; ROADMAP.md; sprint planning cycle 2026-06-01)_
AI-Manager added the agent-readyphase-0P1small labels 2026-06-01 20:35:06 +00:00
Author
Owner

Implemented via PR #165 (merged) together with issue #163.

Changes made in STATUS.md:

  1. Timestamp updated to 2026-06-01 (sprint-planning cycle)
  2. New "Completed This Cycle (2026-06-01 — Sprint Planning Cycle)" section added above the existing triage cycle block — notes #163/#164 implemented + kustomize PASS
  3. Current Blockers updated: removed P1 #120 and P1 #121 (both confirmed closed ); remaining confirmed P1s are #47, #76, #77, #79, #83, #126, [Phase 0] Operator: create `gitea-registry` imagePullSecret in vin-decoder namespace (#127)
  4. New Sprint Summary (2026-06-01 — Sprint Planning Cycle) added: 0 issues closed, 1 new issue created (#163), 0 stale, top actionable task = #163
  5. Existing Sprint Summary top actionable task updated to reflect #163 (immediately actionable pure doc update)
  6. kustomize build flux/ = PASS

All acceptance criteria met.

✅ **Implemented** via PR #165 (merged) together with issue #163. **Changes made in STATUS.md:** 1. Timestamp updated to `2026-06-01 (sprint-planning cycle)` 2. New **"Completed This Cycle (2026-06-01 — Sprint Planning Cycle)"** section added above the existing triage cycle block — notes #163/#164 implemented + kustomize PASS 3. **Current Blockers** updated: removed P1 #120 and P1 #121 (both confirmed closed ✅); remaining confirmed P1s are #47, #76, #77, #79, #83, #126, #127 4. New **Sprint Summary (2026-06-01 — Sprint Planning Cycle)** added: 0 issues closed, 1 new issue created (#163), 0 stale, top actionable task = #163 5. Existing Sprint Summary top actionable task updated to reflect #163 (immediately actionable pure doc update) 6. `kustomize build flux/` = PASS All acceptance criteria met.
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: leeworks-agents/api-company#164